Mineral oil contamination of the saturated and unsaturated soil zone
Discovery, containment, risk assessment and preparation of a remediation plan to treat a mineral-oil hydrocarbon contamination after a heating oil leak.
Planning and performance of percussion core drillings, excavation works, installation of remediation wells. Groundwater remediation using Pump&Treat technology and oil-phase skimming in the remediation well.
All installations including well construction were performed under the technical responsibility and to the specifications of INTERGEO Environmental Technology from January to May 2006.
Our services:
Percussion core drilling
Excavation works
Remediation well
Pump&Treat technology
oil phase skimming
Country:
-
Austria Europe
Responsible office:
-
Austria – Vienna
INTERGEO Umwelttechnologie und Abfallwirtschaft GmbH
Wallagasse 4a
1110Wien