Rail Car Oil Spill Remediation

SUBJECT: 70.000 l Oil spill (Heating Oil Extra-Light) in the vicinity of the freight train station in 9586 Fürnitz

MAIN FOCUS:

Soil and groundwater investigations (with the assistance of 60 deep drillings to the base of the contamination), remediation plan to be performed while not influencing the freight activity of the train station.

Soil-gas and Bio-Venting of 60 remediation wells and adsorption of the vented material in 3 large specialized biofilters.

Groundwater monitoring and documentation (hydrogeological, remediation)

Our services:

Soil and groundwater investigations, remediation plan, IN-SITU soil and soil-gas remediation, laboratory analysis (soil, soil-gas and groundwater samples), reporting, discussions with the authorities.

Country:

    Austria  Europe  

Responsible office:

  • Austria – Salzburg
    INTERGEO Umwelttechnologie und Abfallwirtschaft G.m.b.H

    Robinigstraße 93


    5020 Salzburg

Our services in the project:

Intergeo Services
Chemical Analysis and Laboratory

INTERGEO runs several environmental chemical laboratories which are accredited according to EN ISO / IEC 17025.

Intergeo Services
Soil and Groundwater Investigation and Remediation

Intergeo has performed over 10.000 soil and groundwater investigations in Europe and overseas since being founded in Salzburg in 1983. We provide a single source for all services – from the initial investigation to the detailed remediation action plan.

Intergeo Services
Soil and Groundwater Remediation

INTERGEO implements cutting-edge innovation and technology to simplify remedial actions and reduce costs.