Risk Assessment on a Tank Farm
Discovery, containment, and risk assessment of mineral-oil hydrocarbon contamination on a tank farm (20.000 m²).
Planning and performance of 57 core pile drillings, installation of 5 groundwater monitoring probes including analysis and reporting; water sampling; geodetic measurements; groundwater level measurements; preparation of groundwater models; soil and soil-gas sampling; preparation of damage charts for the saturated and unsaturated soil zones.
Our services:
Core pile drillings
groundwater monitoring probes
analysis, water sampling
geodetic measurements
soil and soil-gas sampling
Country:
-
Austria Europe
Responsible office:
-
Austria – Vienna
INTERGEO Umwelttechnologie und Abfallwirtschaft GmbH
Wallagasse 4a
1110Wien