Risk Assessment on a Tank Farm

Discovery, containment, and risk assessment of mineral-oil hydrocarbon contamination on a tank farm (20.000 m²).

Planning and performance of 57 core pile drillings, installation of 5 groundwater monitoring probes including analysis and reporting; water sampling; geodetic measurements; groundwater level measurements; preparation of groundwater models; soil and soil-gas sampling; preparation of damage charts for the saturated and unsaturated soil zones.

Our services:

Core pile drillings
groundwater monitoring probes
analysis, water sampling
geodetic measurements
soil and soil-gas sampling

Country:

    Austria  Europe  

Responsible office:

Our services in the project:

Intergeo Services
Chemical Analysis and Laboratory

INTERGEO runs several environmental chemical laboratories which are accredited according to EN ISO / IEC 17025.

Intergeo Services
Soil and Groundwater Investigation and Remediation

Intergeo has performed over 10.000 soil and groundwater investigations in Europe and overseas since being founded in Salzburg in 1983. We provide a single source for all services – from the initial investigation to the detailed remediation action plan.