Tunnel Water Treatment
The water arising from the drilling of a tunnel is cleaned and directed into a receiving stream
The groundwater is cleaned with the assistance of additives to cause the sediments to flocculate and to adjust the pH level (CO2, HCl). The water is first directed to a quiet basin, then to a flocculation basin, then to a settling basin. The path of the basins contains a collective shaft for the purpose of testing the water for turbidity and pH level. The water is then directed to an oil separator and then to the receiving stream. Maximum capacity: 20 L/sec.
Our services:
groundwater treatment
turbidity and pH testing
Oil separator
Country:
-
Austria Europe
Responsible office:
-
Austria – Vienna
INTERGEO Umwelttechnologie und Abfallwirtschaft GmbH
Wallagasse 4a
1110Wien