Closure of a company filling station
During the closure of the company filling station the tank was lifted and the connecting pipes disconnected.
The tank was inspected and soil samples were taken to be analysed in the laboratory.
Our services:
Soil sampling
Laboratory analysis
Country:
-
Austria Europe
Responsible office:
-
Austria – Salzburg
INTERGEO Umwelttechnologie und Abfallwirtschaft G.m.b.H
Robinigstraße 93
5020Salzburg