Langley Soil and Groundwater Investigation and Remediation
The remediation of a heavily contaminated 26 hectare former vehicle assembly site close to Heathrow Airport. End uses for the site were to be one third residential development and two thirds commercial/industrial hard cover. Targets for the remediation of the site were set appropriately and generally conformed to ICRCL recommendations, if more suitable, Dutch standards were used.
Die Lösungen
Soil Remediation:
53.000 m³ of hydrocarbon-contaminated soil was bioremediated in windrows/biopiles and backfilled
20.000 tons of hazardous waste (PAH and heavy metals) were specially disposed of using selected excavation
Groundwater Remediation:
The amount of l/s that was remediated was adjusted to the progress of the soil remediation.
7.000m³ of groundwater skimmed to remove free-floating product. 150.000m³ of TPH-contaminated groundwater was pumped and cleaned.196.000 m³ of groundwater was processed by air stripping and activated carbon filters to remove volatile organic compounds.
Our services:
Investigation of the site (soil and groundwater) by drilling, trail pits, sampling, analysis, reporting.
Planning and executing the remediation.