Waste Water Analysis
INTERGEO advises you in selecting and determining the dimensions of a waste water unit, prepares submission documents for oil separators and for the drainage of rain water.
Companies with waste water installations and existing waste water discharges into surface waters, groundwater or sewer systems must have these regularly checked for functionality and to show that the limiting values are being held to.
We take care of the recurring inspections of the oil separators and well drains, sample the waste water and analyse it in our accredited laboratory to ensure and prove that the limiting values are being met to. We also prepare all reports and documentation required by the responsible authorities.
Preparation of submission documents for waste water units and applications for indirect discharger permission.
Preparation of water law submission and sewer plans for oil separators, well drains, rain water drainage.
Our Services include:
- Preparation of indirect discharger permissions
- Waste water analyses
- Indirect discharger report
- Water law submissions
- Oil separator inspections
- Inspection of waste water installations
- Inspections according to water law